Box 6
Container
Contains 39 Results:
NCAR-GAMP Report CBO-2, Height Determination from a Dropsonde, 1973
File — Box: 6, Folder: 12
Dates:
1973
NCAR-GAMP Report CBO-3, Manpower Requirements for Carrier Balloon Launches, 1972
File — Box: 6, Folder: 13
Dates:
1972
NCAR-GAMP Report CBO-5, Operations Analyis of Carrier Balloon Flights at 30 MB in the Tropics, 1972
File — Box: 6, Folder: 15
Dates:
1972
NCAR-GAMP Report CBO-6, Selection of a Launch Site for the CBO System Flight Test, 1973
File — Box: 6, Folder: 16
Dates:
1973
NCAR-GAMP Report CBO-8, Proposed SMS/GOES Carrier Balloon Compatibility Test Plan, 1973
File — Box: 6, Folder: 17
Dates:
1973
NCAR-GAMP Report CBO-10, Phase 1 Omegasonde Windfinding Test Plan, 1973
File — Box: 6, Folder: 18
Dates:
1973
NCAR-GAMP Report CBO-11, Operations Plan for System Flight Tests of the Carrier Balloon/Omegasonde System, 1973
File — Box: 6, Folder: 19
Dates:
1973
