Skip to main content

Box 1

 Container

Contains 54 Results:

Balloon Assembly, August 1972-August 1975

 File — Box: 1, Folder: 1
Identifier: Folder 1
Scope and Contents

A preliminary drawing of the Mother GHOST (henceforth known as the Carrier Balloon) flight train layout is presented as well as administrative correspondence concerning balloon procurement. Also included is a memo from Passi and Lally on the calculation of balloon geopotential height based upon the number of sondes dropped during a day or nighttime environment.

Dates: August 1972-August 1975

HF Transmitter, 1974

 File — Box: 1, Folder: 2
Identifier: Folder 2
Scope and Contents

Correspondence in this file sets forth the rationale for using a sun angle/magnetometer (SAM) technique to locate the position of Carrier Balloons as well as SAM card number assignments and test procedures.

Dates: 1974

Cutdown Device, 1973-1975

 File — Box: 1, Folder: 3
Identifier: Folder 3
Scope and Contents

Correspondence with the U.S. Department of State confirming the addition of am HF command balloon cut-down system on all Carrier Balloon flights to destroy the balloon prior to crossing latitude 20 degrees North. Also included are copies of Department of State cable to the Paris embassy requesting French approval to launch balloons from Kourou, French Guiana.

Dates: 1973-1975

Parachute, 1972, 1974

 File — Box: 1, Folder: 4
Identifier: Folder 4
Scope and Contents

Design considerations and equations are presented for a Carrier Balloon dropsonde parachute.

Dates: 1972, 1974

Dispenser , 1974

 File — Box: 1, Folder: 5
Identifier: Folder 5
Scope and Contents

An analysis of the heat loss and heat capacity of a Carrier Balloon dropsonde launched from a dispenser at a temperature of +20 degrees Celsius to +30 degrees Celsius in daytime and as low as -30 degrees Celsius near dawn is presented as well as the results of empirical tests to determine a thermal time constant.

Dates: 1974

Omegasonde, 1973

 File — Box: 1, Folder: 6
Identifier: Folder 6
Scope and Contents

A memo, Wind Variability with Time and Space using sequential drops of Omegasondes, is described and simplified equations for time and spatial variability of the wind field up to 30 km are presented. Other correspondence covers an Omega Dropsonde Analysis and also a description of error in wind measurement using 3 and 4 Omega-station configurations.

Dates: 1973

Meteorological and Omega Data Digitizer (MODD), 1973-1975

 File — Box: 1, Folder: 7
Identifier: Folder 7
Scope and Contents

Copies of engineering change orders covering the MODD design are included as well as a final report by Operations Research Inc. covering the "Analysis of the Measurement of Phase Using the Beuker MODD."

Dates: 1973-1975

Ground Data Processor (GDP), 1974-1975

 File — Box: 1, Folder: 8
Identifier: Folder 8
Scope and Contents

Several GDP test plans and procedures are found in this file.

Dates: 1974-1975

Command Receiver, 1974-1975

 File — Box: 1, Folder: 9
Identifier: Folder 9
Scope and Contents

Pre-flight test procedures for the Carrier Balloon electronics package and several photos of the electronics package.

Dates: 1974-1975

Dual Mode Transmitter, 1974-1975

 File — Box: 1, Folder: 10
Identifier: Folder 10
Scope and Contents

Copies of several engineering change orders as well as a transmitter tune-up procedure are in this file.

Dates: 1974-1975